n8n delivery for automation agencies

One workflow
off your backlog.

Delegate a bounded repair, refactor, or API migration. Get a source patch, repeatable behavioral checks, and a concise handoff.

You keep the client relationship and pre-deployment review. Blucca handles the agreed implementation and documents what changed.

Fixed scope, price, and delivery date agreed from your actual brief.

Good first assignments

A broken retry path. A payload mapping change. An API migration. A workflow slice that needs cleaning up.

An executed repair example

Before → fix → rerun.

Swiftia render-loop lab
Public historical workflow fragments · self-initiated work

  1. 01 / Before

    Two JSON-body failures.

    Object-valued styling broke JSON parsing before the request. On a failed-render retry, the status response became the current input and styling was lost.

  2. 02 / Fix

    One paired-item expression.

    Replace the interpolated body with a complete object expression. Read the short ID and styling from the paired source item, including during retry.

  3. 03 / Rerun

    Three revised paths passed.

    Completion, polling, and failed-render recovery. Captured request bodies, counts, item identity, and terminal outputs matched the checks.

Executed October 5, 2026 · n8n 2.41.7 · 8 scenarios. Isolated nodes, synthetic items, and local HTTP contracts. The lab covers the reproduced failures and revised paths; live-provider and full-workflow acceptance are separate checks.

Read the repair walkthrough ↗Inspect the recorded results ↗

A small assignment, clearly defined

Start with the
blocked behavior.

Your first email needs just three things: what is blocked or changing, the rough workflow size, and your deadline.

  1. 01

    Send the brief

    A short description is enough to start. Sanitized exports and interface details follow during scoping.

  2. 02

    Agree the assignment

    We confirm the workflow slice, versions, interfaces, acceptance checks, revision scope, fixed price, and delivery date before payment.

  3. 03

    Review the handoff

    Receive the patch, rerunnable checks, and notes. Your agency reviews the work and owns the client release; any live-provider validation is agreed in scope.

Already have implementation covered?

One clear next step

What’s waiting
in your backlog?

Blocked behavior. Rough workflow size. Deadline.

Send a three-line brief